Loading...

Owner's Engineer Services

Owner's Engineer Services

Engineering assignments are being executed by the Engineering Division of the consultancy wing and the Engineering Division of NTPC at the Engineering office Complex in NOIDA. The engineering division has in-house expertise in working with the state of the art IT and Design Automation Tools, equipping it with world class facilities for complete power plant engineering and related services, and becomes a nodal center for quality in engineering, introduction of new technologies and uniformity in application of engineering standards to all projects.

Services offered as Owners' Engineers include the following:

  • Feasibility reports and detailed project reports
  • Basic engineering including optimisation studies on project systems and schemes
  • Preparation of project design memorandums, technical specifications and tender documents
  • Techno-Commercial evaluation of offers/ selection of EPC Contractor
  • Post award and review engineering
  • Field engineering 

NTPC's experience as Owners engineer is given below:

Sl.No.Client's NameName of the projectsServices ProvidedYear
199THDCIL2X660 MW TPP, KhurjaPreparation of Pre-FR, TOR for EIA and technical specifications for setting up 2x660 MW TPP at Khurja in dist. Bulandshahar2011
198SCCL2X600 MW Singareni TPPConsultancy services to SCCL for Post award consultancy services for 2x600MW TPP at Adilabad.2011
197RGPPLRatnagiri expansion Power ProjectConsultancy services to RGPPL for preparation of FR & conducting site specific studies for expansion of Ratnagiri Power Project2011
196NSPCLRourkela Coal based Power ProjectConsultancy services to NSPCL for Preparation of FR for setting up of Coal Based Power Project at Rourkela2011
195NSPCLBokaro expansion Power Project (4X250 MW)Consultancy services to NSPCL for Preparation of FR for Bokaro expansion power project (4x250 MW)2011
194BFNESLManufacturing Plants, SholapurConsultancy services to BFNESL for providing Engineering Services for developing manufacturing plants at Sholapur.2010
193HPCL800 MW CCPPConsultancy services to HPCL for preparation of Pre-FR & ToR for setting up 800 MW CCPP2010
192BSEB1X250 MW unit, Barauni TPPConsultancy services to BSEB for preparation of DPR for 1X250 MW unit at Barauni TPP, Bihar2010
191KBUNL2X195 MW TPP, Muzaffarpur, BiharPre & Post award consultancy services for setting up 2X195 MW expansion project at Muzaffarpur Thermal Power Station.2010
190NTPC-BSEB JV3X660 MW TPP, New Nabinagar, BiharConsultancy services for Pre and Post-award services to Nabinagar Power Generating Company for setting up 3X660 MW STPP at New Nabinagar, Bihar.2010
189PPCL750 MW CCPP, Bamnauli, DelhiConsultancy for Pre-award services for 750 MW Pragati-II Power Project at Bamnauli2010
188Railways1000 MW TPP, Adra, WBPreparation of Pre-Feasibility report for 1000 MW TPP at Adra, WB2010
187Andaman & Nicobar Administration33 MW Generating StationPreparation of Feasibility report for 33 MW generating system2009
186DVC2 X 660 MW, Raghunathpur-IIPreparation of DPR for installation of 2X660 MW units at Raghunathpur Stage-II2009
185Singareni Collieries Company Ltd2 X 600 MW TPP in Dist. Adilabad, APPre award services including preparation of technical specifications, technical and commercial evaluation of BHEL's2009
184DVC2 X 660 MW, Raghunathpur-IIConsultancy for Pre-award services for SG & STG for 2X 660 MW at Raghunathpur-II2009
183NHDC2 X 660 MW Reva TPPConsultancy services for preparation of DPR and technical specification for Site specific studies for 1320 MW (2X660 MW) Reva TPP2009
182UPRVUNL1 X 660 MW TPP, HarduaganjConsultancy services to UPRVUNL for DPR of 1X660 MW coal based power plant at Harduaganj Extn-II2009
181UPRVUNL2 X 660 MW Obra 'C' TPPPreparation of technical feasibility report and DPR for 2X660 MW Ext units under Obra "C" TPP2009
180DVC2 X 660 MW,-IIConsultancy for Pre-award services for SG & STG for 2X 660 MW at Raghunathpur-II2009
179Singareni Collieries Company Ltd2 X 600 MW TPP in Dist. Adilabad, APPre award services including preparation of technical specifications, technical and commercial evaluation of BHEL's2009
178NTPC-Railways JV4X250 MW Nabinagar TPPPre & Post award consultancy services for 4X250MW Nabinagar TPP2008
177MUNPL2 X 660 MW TPP at Meja in Allahabad (U.P)Pre & Post award services for setting up of 2X660MW TPP at Meja in Allahabad Distt. (U.P)2008
176APCPL(3X500 MW) 1500 MW Thermal Power Plant in HaryanaOwner Engineer by PFC Ltd. For the loan agreement Between APCPL and PFC for setting up (3X500 MW) 1500 MW Power Plant in Haryana2008
175Green Energy132/11 KV Substation, Tijara Town. Dubai. UAEEngineering Design Review2008
174PPCL1500 MW (Nominal) Pragati-III, CCPP. Bawana, DelhiPost award services for 1500 MW (Nominal) Pragati-III, CCPP2008
173NTECL3 x 500 MW Vallur power projectDesign, Engg., contracting, monitoring, QA&I for setting up power plant. For additional 1 X 500 MW2008
172APCPL3X500 MW Tpp, JhajjarConsultancy services to Aravali Power Company Pvt. Ltd. (JV company- NTPC, HPGCL & IPGCL) for setting up 3X500 MW Power plant in Haryana2007
171HPGCL2X300 MW DCRTPP, Yamuna NagarConsultancy services to HPGCL for PG test for 2X300 MW DCRTPP, Yamuna Nagar2007
170HPGCL2X210 MW Panipat TPSConsultancy services to M/s HPGCL, Panipat for energy audit of Unit nos. 5&6 (210 MW units)2007
169PGCILKorba STPSConstruction of bays at Korba STPS Switchyard for Korba-Brisinghpur-Damoh 400 KV D/C transmission2007
168UPRVUNL2X250 MW Harduaganj Extn.Pre-award services for Harduaganj Extn. Project2007
167NTECL2X500 MW Vallur TPPPre & Post award Services excluding Site supervision services for 2X500 MW Vallur TPP2007
166PPCL1000 MW Pragati-III CCPPPre-award services to PPCL for setting up of 1000 MW Pragati-III CCPP2007
165UPRVUNLAnpara-DOwners Engineer Services for Anpara-D2006
164UPRVUNL2X250 MW Paricha Extn.Post award consultancy services to UPRVUNL for 2X250 MW Paricha Extn.2006
163UPRVUNL2X250 MW Harduaganj Extn.Post award consultancy services to UPRVUNL for 2X250 MW Harduaganj Extn.2006
162IOCLBarauni RefineryElectrical System study at Barauni Refinery2006
161SRPCL58 MW CCPP, RamanathapuramConsultancy services during pre-commissioning activities for 58 MW CCPP at Ramanathpuram, TN2006
160UPRVUNL2X500 MW & 2X500 MW Obra TPS Extn.Technical feasibility study of 2X500 MW & 2X500 MW Obra TPS Extension.2006
159DVC2X500 MW Koderma TPPEngineering consultancy for 2X500 MW Koderma TPP under 11th Plan2006
158APGENCOKTPS(ABC), KTPS Stage-V & RTS-B stationsCS for carrying out Auxiliary consumption audit in the units of KTPS (ABC), KTPS Stage-V & RTS-B stations of GENCO2006
157SSNNLSBC pumping SchemeSelection of O&M contractor for SBC pumping scheme.2006
156APGCL235 MW CCPP, NamrupDPR for 235 MW CCPP at Namrup2006
155GIPCL2X1000 MW new project in south Gujarat near SuratEvaluation of RFQ bis, preparation of RFP documents and evaluation of bids for selection of JV partners2005
154DJB40 MW Captive Gas Power PlantPreparation of FR for 40 MW CGPP at Sonia Vihar.2005
153PGCILAuraiya Gas Power ProjectDeposit work for execution of 400 KV bays extension at Auraiya GPS Switchyard2005
152SSNNLKachchh Branch CanalPre & Post award engineering for pumping plants on Kachchh Branch Canal2005
151GIPCL2X1000 MW PPReview of Information memorandum for selection of JV partners for proposed 2X1000 MW PP.2005
150PPCL330 MW Pragati CCPP, Extn.Preparation of EIA studies for Pragati Phase-I2005
149IOCLHaldia RefineryDetail study for 2nd Gas turbine hook-up at Haldia Refinery of IOCL2005
148CSEB2X660 MW Surguja TPSDPR for 2X660 MW Coal based TPS, Distt. Surguja2005
147DVC210 MW Durgapur TPS, U-4Condenser Leak Detection Test with Helium Gas for DTPS U-4 (210 MW)2005
146PPCL330 MW Pragati CCPPPreparation of FR for Pragati CCPP Ph-II-330 MW2005
145IPGCLRajghat TPSInstallation of effluent treatment plant for Rajghat TPS.2004
144APGENCORayalseema TPSAuxiliary power consumption audit at Rayalseema TPS2004
143UPRVUNL500 MW Anpara C TPSSelection of developer & providing technical services for preparation of RFP document, bid evaluation, award recommendations.2004
142CSEB2X250 MW Korba (W) TPSPreparation of tender document for 2X250 MW to 2X300 MW Korba (W) TPS2004
141CSEB2X250 MW Korba (W) TPSPreparation of revised comprehensive EIA report for Korba (W) TPS2004
140DVC2X250 MW Mejia TPS Extn.Determining the project cost for 2X250 MW Mejia TPS Extn.2004
139IOCLHaldia RefineryElectrical system study at Haldia Refinery of IOCL2004
138APGPCL272 MW Vijjeswaram CCPPSelection of O&M Contractor for 272 MW Vijjeswaram CCPP2004
137PPCL300 MW Pragati CCPP Extn.Preparation of Pre-FR for proposed PP on ash bund area on Ring road2004
136PGCILSipat TPPDeposit work for 400 KV bays at Sipat STPP Switchyard2004
135PGCILNCPS, DadriDeposit work for construction of 400 KV Switch yard line bay extension at NCPS, Dadri2003
134GPCLGhogha Lignite PPSelection of JV partner for Ghogha Lignite PP 
133Essar Power Ltd.515 MW Essar CCPPAuditing of electrical system at 515 MW CCPP of Essar Power Ltd.2003
132IPGCLIP Station & Rajghat TPSEvln. of tech. & commercial bid for Ash dyke for IP Stn. & Rajghat TPS.2003
131UPRVNL2 x 500 MW Anpara TPPPrep. of tender doc. for 2 x 500 MW Anpara TPP2003
131UPRVNL2 x 500 MW Anpara TPPPrep. of tender doc. for 2 x 500 MW Anpara TPP2003
130UPRVNLHarduaganj TPSPrep. of technical FR for Harduaganj TPS2003
129MSEBKoradi TPSRaising of Ash bund & spillway from TBL 325 M to 328 M for Koradi TPS2003
128PPCL330 MW CCPPPrep. of FR & EIA report2003
127GPCL500 MW TPP in ChhattisgarhSelection of JV partner for developing 500 MW TPPin Chhattisagrh2003
126APGENCO542 MW Vemagiri CCPP.Updation of Pre-FR for Vemagiri CCPP.2003
125IPPGCO.2 x 67.5 MW Rajghat TPSAsh pond mgmt. For IP Stn. & Rajghat TPS.2003
124CSEB2 x 250 MW Korba East TPS.Evaluation of EPC bid & prep. of DPR for 2 x 250 MW Korba East TPS.2002
123CSEB2 x 250 MW Korba West TPS.Up stream slope protection of earthen bund at Korba West TPS.2002
122CSEB2 x 250 MW Korba East TPS.Modification of earthing arrangement in 6.6.kV auxiliary supply at Korba(East)TPS2002
121CSEB2 x 250 MW Korba East & West TPS.Augmentation of fly ash collection system and ash water re-circulation for Korba East & West.2002
120CSEB2 x 270 MW Korba West TPSReview of FR,Prep. of DPR,Prep. of tender doc. For EPC contract,pre-of pre-qualification criteria and prep. of NIT and WIA report.2002
119CSEB2 x 250 MW Korba East TPS.Review of FR,Prep. of DPR,Prep. of tender doc. For EPC contract, pre-of pre-qualification criteria and prep. of NIT and WIA report.2002
118DVB2 x 67.5 MW Rajghat TPSReplacement of DAS at 2 x 67.5 MW Rajghat TPS.2002
117J&K Power development Corp.1000 MW PP in J&K State.Prep. of Pre-FR for setting up 1000 MW Power project in J&K state.2002
116SSNNLSaurashtra Branch CanalScrutiny of detailed engg., structural design for the work of SBC pumping scheme.2001
115NALCO2 x 120 MW CPPPrep. of detailed FR for Ash collection and disposal system for two existing units of 120 MW each.2001
114DVB1000 MW Bawana Power projectSelection of JV partner for 1000 MW PP at Bawana.2001
113Konaseema Oakwell EPS441 MW Konaseema CCPPOwner's Engineer Services including site supervision2001
112NDMCSub-stationsCS for establishing 33 kV & 66 kV sub station2001
111Gujarat Mineral Development Corporation2x125 MW Akrimota Lignite based Power PlantSupervision of construction/erection & FQA services for 2 x 125 MW Lignite based power plant at Akrimota2001
110DVBIP stationCS for comprehensive study2000
109NALCONalco captive Power PlantCS for updating the cost of 8th unit2000
108Rural Electricity CorporationConstruction of office buildingCS for review of estimate2000
107Railways board500 MW Coal based plantFeasibility report for setting up a coal based TPS2000
106Admn. of Andaman & Nicobar islands5 MW Andaman DGPPFeasibility report2000
105Power Grid Corporation Of India Ltd. (SR)PGCIL Township at Kayamkulam CCPPDeposit work for construction of dwelling units Kayamkulam1999
104Delhi Vidyut Board.300 MW Combined Cycle Power Project.Owner's Engineer Services.1999
103NDMCSub-stations of NDMCConsultancy services for earthing system1999
102MSEBKoradi Thermal Power StationCS for raising ash dyke1999
101NALCO30 MW Black start up powerFeasibility report preparation1999
100APGENCO650-700 MW gas based CCPP at VemagiriPre-feasibility report for the proposed station1999
99DVBIP stationTechnical feasibility for water treatment plant.1999
98National Aluminium Company.Nalco captive power plant.Review of issues relating to setting up of 8th Unit.1999
97Union Territory of Chandigarh.100 MW CCPP at Chandigarh.Feasibility Report & EIA study.1999
96North Eastern Electric Power Corpn.4 X 21MW Agartala Gas Turbine Project.Consultancy services for review of tenders for Water Treatment System.1999
95Usha Martin Industries Ltd.1 X25 MW Captive Power Project plant at Jamshedpur.Consultancy Services for development for Ash Mound.1999
94Andhra Pradesh Power Generation Corporation Ltd.2X210 MW coal based Rayalaseema thermal power project.Technical evaluation of bids received from EPC Contracts.1999
93Surat Municipal Corporation Ltd.60 MW captive power plant.Preparation of feasibility Report.1999
92Power Grid Corporation Of India Ltd. (NR)220kV switchyard at Faridabad Gas Based CCPPDeposit work for switchyard erection1998
91Tamil Nadu Electricity Board.500MW Thermal Power Plant at Tuticorin.Preparation of Feasibility Report and EIA study.1998
90Punjab State Electricity Board120 MW Naphtha based power plant.Updating the cost estimate for DPR.1998
89Bharat Aluminium Co. Ltd.Captive power plant at Korba.Feasibility report for 2X67.5 MW extension.1998
88ONGC-NTPC joint venture.400 MW Gas based power project at Hazira.Feasibility report & EIA study.1998
87Delhi Vidyut Board.300 MW Pragati CCPP.EAI study.1998
86Larsen & Toubro.2x287 MW TPP at Bhilai.Review of engineering for 275 Mtr. high chimney.1998
85National Aluminium Company.Captive power plant at Angul.Examining need for setting up 8th unit.1998
84Kerala State Electricity Board.128 MW Diesel PP at Kozhikode.Finalization of Contract, Detailed Engg., Inspection Services, Construction, Supervision.1997
83West Bengal Power Development Corporation Ltd.2X210 MW TPP at BakreswarProject management, QA& Inspection, FQA Services.1997
82Delhi Vidyut Board.300 MW Pragati CCPP.Feasibility Report.1997
81Delhi Vidyut Board.300 MW Indraprastha CCPPTechnical feasibility.1997
80Tamil Nadu Industrial Captive Power Company Ltd.2X250 MW Thermal Power Project at Srimushnam.Preparation of PDMs, technical specifications for Main Plant, engineering for Chimney and finalization of quality plans.1997
79National Buildings Construction Corporation Ltd.2X210 MW Thermal Power Project at BakreswarDesign of Chimney.1997
78Sargent & Lundy, USA.Rain Calcining Unit, Vishakhapatnam.Deputation of NTPC experts for site construction supervision.1996
77Sardar Sarovar Narmada Nigam Ltd.Saurashtra Branch Canal.Model studies for pumping system.1996
76Sumitomo Corporation.Gas based CCPP at Vijjeswaram.Checking of Stack design.1996
75Siasin Energy Private Ltd.Vypeen Power Project.Pre Award Owner's Engineer Services.1996
74Tamil Nadu Electricity BoardNMTPP- SimulatorEvaluation of Bids for Thermal Training Simulator1995
73West Bengal, PowerProposed Power Project in RajasthanAssistance in preparation of Bid1995
72Videocon International Ltd.2X525 MW North Madras Thermal Power Project- II.EIA study, Detailed Engg, Quality Assurance & inspection etc.1995
71Jindal Power Ltd.Raigarh-2X250 MW, Thermal Power Project.Feasibility Report, Engg. DPR, Review Engg., QA & Inspection, site Supervision.1995
70Sargent & Lundy, USA.Rain Calcining Unit, Vizag.Dispersion Modelling Studies.1995
69Sardar Sarovar Narmada Nigam Ltd.Saurashtra Branch Canal.Basic engineering for Concrete Volute Casing Pumps.1995
68Westmont Engineering, Malaysia.Gas based Power Plant in Orissa.Preparation of DPR for Barge Mounted Power Plant.1995
67National Development Corpn., Tanzania.Mchuchuma Mining-cum-Power Project.Preparation of Feasibility Report.1995
66Punjab State Electricity Board.200 MW Thermal Project.Preparation of Feasibility Report.1995
65Saudi Cable Marketing Co.Transmission System enhancement in Saudi Arabia.Seminar on High Voltage Transmission System.1995
64National Building Construction Corpn. Ltd.Bhatinda TPS (2X210 MW) of PSEB.Design of Chimney.1995
63Surat Electricity Co.--Pre- Feasibility Report for Thermal Project.1995
62Dubai Electricity & Water Authority.Awir, Hatta & Mushrif Substation.Turnkey Construction of 2 nos. 132kV substation & modification of one substation.1994
61Spectrum Power Generation Ltd.206 MW Kakinada Gas Based Combined Cycle Power Plant, Andhra Pradesh.Engineering, QA & Inspection, Contract & Procurement, Project Management, Site Supervision, Pre-commissioning services.1994
60Videocon Intl. Ltd500 MW north Madras Thermal Power Stage IIPreparation of Feasibility report1994
59Videocon Intl. Ltd.500 MW North Madras Thermal Power Stage- IIPreparation of Functional Specification1994
58Karnataka Electric Board.1000 MW Thermal Power Project.Review of FR by Cogentrix, USA.1994
57Indian Oil Corpn.Captive Power Plant at Mathura Refinery.Preparation of Feasibility Report.1994
56Asea Brown Boveri Ltd.230 MW Gas Based CCPP at Jegurupadu for GVK Industries.Design & Engineering Consultancy Services for CW System.1994
55Oman Oil Company.Proposed Gas Based Power Project.Preparation of Pre- Feasibility Report.1994
54India Dye Stuff Industries.Private Sector Power Projects Madhya Pradesh.Technical Services for Private Sector Power Project in Madhya Pradesh.1994
53West Bengal State Electricity Board.Santaldih Thermal Power Station.Consultancy Services for Ventilation System of TG Building.1994
52Damodar Valley Corpn.Bokaro 'B' Thermal Power StationConsultancy Services for Ash Handling & Disposal.1994
51Bharat Aluminum Co. Ltd.TL Link from Korba Super Thermal Power Project.Study of transmission Link between Korba STPP and Balco Captive Power Project.1994
50Nepal Electricity Authority.Seventh Power Project (ADB Assisted).Execution of twenty-one nos. 132, 66 and 33kV substations on turnkey basis.1993
49Gas Authority of India Ltd.220kV line terminal bays at Auraiya Gas base power plant.Engineering and construction of line bays.1993
48Gujarat Electricity Board.220kV line terminal bays at Kawas Gas Based Power Plant.Engineering and construction of two additional line bays.1993
47Madhya Pradesh Electricity Board.220kV line terminal bays at Auraiya Gas Based Power Plant.Engineering and construction of two additional line bays.1993
46India Oil Corpn. Ltd.3X25 MW Panipat Captive Thermal Power Station.Preparation of feasibility report, design, engineering, QA& Inspection, procurement, project management & site supvsn.1993
45Usha Rectifier Corpn. Ltd.Redi & Jagdishpur Power Station.Preparation of feasibility Report for Power Station at Redi, Maharastra & Jagdishpur, U.P.1993
44Neyveli Lignite Corpn. Ltd.Thermal Power Station-I.Automatic Fire Sprinkler System for Cable Gallery.1993
43Govt. of OrissaDurgapur Thermal Power Station.Preparation of feasibility report & field investigation.1993
42Govt. OF OrissaGopalpur Thermal Power Station.Preparation of feasibility report & field investigation.1993
41ACC Babcock LtdBudge Budge TPP of CESC LTD.Design, Engineering, Procurement and Inspection services for boiler, Control & Instrumentation.1993
40Bombay Suburban Electric Supply Ltd.Substation Townships.Architectural & Civil design of staff quarters at substation sites.1993
39West Bengal state Electricity Board132 KV Transmission Line.Review of tower design and revised river crossing proposal.1993
38Govt. of OrissaNaraj Thermal Power station.Preparation of Feasibility Report & field investigation.1993
37EPDCI, JapanKathalguri Gas Power Project.Engineering services for intake well, raw water piping and bridge.1993
36Madhya Pradesh Electricity BoardGwalior Gas Project.Preparation of detailed feasibility report.1993
35Bharat Heavy Electrical Ltd.2X210 MW Kerman Power Station, IranDesign and engineering of steel lined multi-flue Chimney.1993
34Sunflag IndustriesWaste heat recovery in steel plant.Assessment of thermal potential of exhaust gas & char of the kiln and optimal solution for waste heat recovery.1993
33Assam state Electricity BoardAmguri Gas Power Project.Establishment of gas linkage and pre-feasibility study.1993
32North Eastern Electric Power CorporationKathalguri combined Cycle Power Project (6X30+3X30 MW).Preparation of amended detailed project reports.1992
31Balarpur Industries Ltd.Manah Gas project, OmanPre-tender Services1992
30Damodar Valley Corpn.(3x200 MW) Mejia Thermal Power Project.Basic design and detailed engineering including const. drgs. for 220m high Chimney.1992
29North Eastern Electric Power Corporation.Kathalguri Combined Cycle Power Project (6X30+3X30 MW).Complete design & detailed engineering for civil works of the project.1992
28Bombay Suburban Electric Supply Ltd.2X250 MW Dahanu Thermal Plant (Generating station).Preparation of Specn., detailed design & engineering, technical evaluation of tenders, QA & Inspection of line materials.1992
27Dubai Electricity & Water Authority.400 & 132kV transmission line construction.Turnkey supply and installation/constn. of 400kV & 132 kV Transmission line and up-gradation of existing 132kV line to 400kv.1991
26Orissa State Electricity BoardTalcher Thermal Power Station.Design and engineering of Ash pond and recycle of water.1991
25Bombay Suburban Electric Supply Ltd.Dahanu 2X250 MW Thermal Power Station (Transmission Lines.).Review of design and drgs. of 220 KV transmission line towers and tower foundations.1991
24Birla GTM/E Technical Services Ltd.Andhra Pradesh State Electricity Board.Pre- tender transmission line tower and foundation design.1991
23J.K. OrganisationEnergy sector studies.Techo- commercial comparison of thermal power project using different fuel mix and recommendation for setting up Power Plant.1991
22Karnataka Power Corporation Ltd.Raichur Substation.System Studies to assess quantum of reactive compensation and fault studies.1991
21Karnataka Electricity Board.Transmission System.Engineering, Procurement, Project Management & construction of 400kV line loop-in loop-out.1990
20Maharastra State Electricity Board.Chandrapur Phadge HVDC transmission system.Basic and detailed engineering, tender evaluation, QA & Inspection, site supervision.1990
19Steel Authority of India Ltd., Bhilai60MW Gas Based Captive CCPP.Preparation of Feasibility Report1990
18Orissa Power Generation Corporation.Ib Thermal Power Station.CW System Studies1990
17GVK Industries Pvt. Ltd.400MW Gas Based Power Project in Godavari Basin.Preparation of Feasibility Report1990
16Delhi Vidyut Board.220kV Mandaula Substation.Design, engineering, procurement and execution on turnkey basis.1989
15Delhi Electric Supply Undertaking.400 KV double Circuit Transmission Line & 400/ 220KV substations.Design, engineering, procurement, QA & Inspection and assistance in site construction.1989
14Eastern Coal Fields Ltd.Farakka- Lalmatia 220KV Transmission Line & 220/132KV Substation.Design, Construction, operation & Maintenance.1989
13Bombay Suburban Electric Supply Ltd.2X250MW Dahanu Thermal Power Station.Basic engineering, spenc. preparation for main packages detailed engineering for chimney and QA for main plant.1989
12TATA ExportsTransmission Lines project of EGAT, ThailandDesign of 230 KV Transmission Towers including line diagrams, all types of standard RCC foundation design.1989
11Bombay Suburban Electric supply Ltd.2x 250 MW Dahanu Thermal Power Station (Transmission Lines)System studies, design preparation of specn. for part 220 KV transmission lines and substation material/ services1989
10Madras Refineries Ltd.Study of Captive Power Station (20MW), Boiler & TG AuxiliariesExamination of present Captive Power Plant to determine likely availability on assured basis in future.1989
9National Project Construction Corporation.Kathalguri-Mariani 400KV Towers Double circuit line of NEEPCOTower Design for 400 KV Tower.1989
8Delhi Vidyut BoardIndraprastha Thermal Power Station.Preparation of Feasibility Report for closed circuit CW System.1987
7Coal India Ltd.Captive Gas Turbine Plant.Preparation of specification.1987
6ASEA, SwedenHydro Quebec-New England, multi terminals HVDC project.System studies & Engineering.1987
5Delhi Vidyut BoardRajghat Thermal Power Station (2X67.5 MW)Engineering Review1987
4Bridge & Roof CompanyNeyveli Lignite Thermal Power Station Stage -II (4X210 MW)Pre-Tender design for Chimney1986
3Bharat Aluminium Co.4X67.5 MW Captive TPS at Korba & associated 220KV transmission system.Design, Construction, Commissioning and Project Management.1984
2Neyveli Lignite Corporation.400 KV Transmission System including two 400 KV Substation.Design, Construction, Commissioning and Project Management.1984
1Bharat Heavy Electrical Ltd.Vishakhapatnam Steel Plant Captive Thermal Power stationMulti-flue Chimney Design1983
Back to Top