Power Generation

Hydro Based Power Projects

NTPC has increased thrust on hydro development for a balanced portfolio for long term sustainability. The first step in this direction was taken by initiating investment in Koldam Hydro Electric Power Project located on Satluj river in Bilaspur district of Himachal Pradesh. Other hydro project under construction are Tapovan Vishnugad, Lata Tapovan, Rammam III, THDC-Vishnugad Pipalkoti, THDC-Tehri PSP and NEEPCO-Kameng.

NTPC Own Operational Capacity

Sr. No.StationSTATECapacity (MW)
1.Koldam (HEPP)Himachal Pradesh800
Total800

 

NTPC JV/ Subsidiary operational capacity
SNo.StationStateCapacity (MW)
1.Tehri HPP (THDC)Uttarakhand1000
2.Koteshwar HPP (THDC)Uttarakhand400
3.Ranganadi HEP (3X135) (NEEPCO)Arunachal405
4.Doyang HEP(3 X 25) (NEEPCO)Nagaland75
5.Pare HEP(2 X 55) (NEEPCO)Arunachal110
6.Tuirial HEP(2 X 30) (NEEPCO)Mizoram60
7.Kopili HEP(200+50+25) (NEEPCO)Assam275
8.Kameng HEP(4 X 150)  (NEEPCO)Arunachal300
Total2,625