RAMMAM STAGE-III (120 MW) | |
---|---|
Location | Approx 150 Km from Bagdogra / Siliguri in Distt. Darjeeling. The Darjeeling town is 50 km form the project. |
Type of Scheme | Run of the River |
Head & Discharge | 481.33 & 28 cumecs |
Diversion structure | Barrage with 4 gates bays of 10m each |
Water Conductor System | HRT – 8.2 Km long, 4.00 m dia. D-shaped, with one Adit 800m long. Design Discharge – 28 cumecs |
Surge shaft | Restricted orifice type. Diameter : 14.5m Height : 52.5 |
Pressure Shaft/Penstock | Length 1520 - 1 No. Diameter:2.5m Steel |
Power House | Surface (3 x 40 MW) |
Type of Turbine | Pelton |
Tail Race | Cut and cover box section. 740m long, size: 4m x 3m |
Land requirement | Govt. land : 17 Ha Pvt. Land : 49 Ha |
Annual Generation (90% Dep. Yr.) | 476 MU |
RAMMAM STAGE -III (120 MW) Rammam Stage III Hydro Electric Power Project BSNL Building, 3rd Floor Jorethang, P.O.- Nayabazar South Sikkim, PIN-737121 Fax No.-0354-2222952 |